Thursday, May 27, 2010

Floating-arm Trebuchet Plans

Meters Autocad Blocks for Building

METERS FOR BUILDINGS
Us "itg Constructions offers our clients the service of development Metro and Budgets for Buildings, in the following disciplines: Architecture
.
Structures.
electrical installations. Sanitary
. METERS

involves measurement of lengths, areas and volumes, which requires management and raises arithmetic geometric formulas, usually simple and generally dominated.
work measurement can be executed in two ways: on the work itself, or on the planes
1. General principles:
• Study
documentation set interpretation of a plane can not be achieved if do not have the overview of the work
• Respect

plans
The calculation shall be as directed by the plans and specifications. During the operation of subway bring out the errors and omissions in the drawing, with the result that the computer is also an effective contributor to the project
• Comply with rules
• Measure accurately
Within reasonable limits of tolerance should achieve a much higher degree of accuracy, where the higher the cost of the item being studied.
2. Rules:
In our country there is the so-called Regulation of meters for Building Works (DS N ยบ 013-79-VC of 29/04/1979)
3. Required Documents:
Plant definitive plans, section and elevation drawings

Structures and Facilities Detail Plans Plans Finishes

4. Metro Technical
• The work is divided in stages, each of which is a budget item (Structures, Architecture, Sanitary and Electrical).
• The work must be detailed in all its parts to facilitate further review, correction or modification.
• It will seek an order, a provision allowing to minimize the number of operations and measurements.

0 comments:

Post a Comment